COUNCIL CHAMBER – CAN BOTINO
Start Date: August 2021
End Date: October 2021
Location: Carrer de Pere Tur, Eivissa
Promoter: Eivissa City Council
Cost: €36,000
Replacement of the drainage system for the air conditioning machines in the council chamber and the rest of the Can Botino building, which currently serves as the headquarters of the Ibiza City Council. The previous system, which used motors and pumps to evacuate water, was replaced with a new system that channels the water through existing pipes.
Additionally, the entire false ceiling was replaced, a new lighting system was installed, and the wooden floor was sanded and varnished. The presidential table was also reproduced to match the original design.