PINK HOUSE

Start Date: August 2015
End Date: January 2017

Location: Cala Salada

Project for the reconstruction of the old villa known as “the pink mansion of Cala Salada.” The reform project involves waterproofing the roofs and repairing water entry points.

Subsequently, the wooden pergolas will be repaired, replacing beams at risk of breaking.

Finally, the wall coverings will be repaired by removing damaged coatings from the facade while maintaining the original color.