Reform and partial rehabilitation of the museum building. The renovation of rainwater drainage on the exterior, located at the front of the structure, was carried out. Painting and reconditioning work was conducted on deteriorated roofs, and the entrance porch was structurally reinforced.
Stairs were also adapted to comply with current regulations, and a fire evacuation staircase was installed.